How long does it take to build a website?

How long a website takes depends on its scope and how quickly decisions and content come in. In most projects the biggest delays are waiting on content and approvals, not building. A clear scope and a single decision-maker are the best ways to keep a project on schedule.

The stages

  1. Discovery. What the site is for, who it is for, and what a visitor should do next.
  2. Structure and content. Which pages exist, what each one says, and what you need to supply.
  3. Design. How it looks and feels, reviewed with you.
  4. Build. The site is made, connected to your tools, and tested on real devices.
  5. Review and launch. Final changes, then going live.

What slows a project down

  • Content that is not ready
  • Several people giving conflicting feedback
  • Scope that grows after the build begins
  • Late decisions about which tools the site must connect to

What speeds it up

  • One person with the authority to approve
  • Writing and images ready before design begins
  • A short, firm list of what the site must do on day one

From our work

Sites that connect to other tools, such as a configurator feeding a CRM, add a planning stage up front. Deciding what information needs to move, and where it goes, early is what keeps the build itself fast.